• Documents
  • Authors
  • Tables
  • Log in
  • Sign up
  • MetaCart
  • DMCA
  • Donate

CiteSeerX logo

Tools

Sorted by:
Try your query at:
Semantic Scholar Scholar Academic
Google Bing DBLP
Results 1 - 10 of 17,167
Next 10 →

Table 5 Goals of the main agents

in Capability Management
by G. B. Wills, S. Kim, R. Ashri

Table 4.1: Measurement platforms, their coverage, and main science goals during the VOCALS RF field program. Measurement Platform Coverage/sampling Main science goals

in unknown title
by unknown authors 2005

Table 1 Main ReSpecT predicates for reaction goals

in Formal ReSpecT
by Andrea Omicini, Enrico Denti
"... In PAGE 8: ... In particular, R accomplishes the definition of the non-terminal symbol hReactioni in Table 3. The set O = fout; in; rd; inp; rdpg of the admissible communication op- erations, and the set Or = fout r; in r; rd r; no rg of the admissible reaction operations include all the operations for writing, accessing and consuming tu- ples according to both Table1 and Table 3. Altogether, the set O+ = O [ Or contains all the admissible tuple centre operations for a ReSpecT tuple centre.... ..."

Table 4: Local Oscillators { Main Speciflcations Item Speciflcation Goal (if difierent)

in System Design Description
by Larry R. D’addario, Larry R. D’addario
"... In PAGE 12: ... Thus the overall result is a compromise. Taking these considerations into account results in the power requirements given in Table4 A. For further discussion, see [21].... In PAGE 12: ... For further discussion, see [21]. Table4 A: First LO Power Band Freq Range Junctions Mixers Minimum Goal per mixer per pol. per pol.... In PAGE 12: ...3.4) at other telescopes allows more realistic requirements to be set, as shown in Table4 B. Here the requirements are expressed in time units, representing uctuations or uncertainty in signal delay; most efiects are nearly independent of observing frequency when expressed this way.... In PAGE 13: ...Table4 B: Phase Errors rms in fsec Basis Total Atmos Struct Elec Coherence Preliminary [21] 90% at 950 GHz 54.5 38.... In PAGE 13: ... The drift requirement applies to the phase change over a complete calibration cycle of at least 300 sec; it is desirable for it to be met for longer times, up to 1000 sec. We allocate the instrumental errors between the structure and the electronics somewhat arbitrarily, with 25% of the squared error allowed for the structure and 75% for the electronics; these are the values shown in Table4 B. The structural allowance is then somewhat smaller than the 50 fsec allowed in the speciflcation for the prototype antennas, but it is expected to be achievable.... ..."

Table 1. The main goal of the third step is to store the data base in an application friendly way. To this end, we provide two representations of the data base. An explicit version of the data base contains one point set for each planar order type, all in 16-bit integer representation.

in Abstract Order Type Extension and New Results on the Rectilinear Crossing Number (Extended Abstract)
by Oswin Aichholzer, et al.
"... In PAGE 2: ... Table1 : Number of order types of cardinality n = 11. Supporting the reliability in the construction of our data base, all algorithms to generate the complete data base of abstract order types are of purely com- binatorial nature.... ..."

Table 4: Experiment 2, main non terminal functions (kickTo TheirGoalPos)

in Developing A Team Of Soccer Playing Robots By Genetic Programming
by Vic Ciesielski, Peter Wilson 1998
Cited by 1

Table 3: Characterization of goal-based evaluation of IT-systems as such Main

in Strategies for Information Systems Evaluation – Six Generic Types
by Stefan Cronholm, Göran Goldkuhl 2003
Cited by 1

Table 5: Characterization of goal-free evaluation of IT-systems in use Main

in Strategies for Information Systems Evaluation – Six Generic Types
by Stefan Cronholm, Göran Goldkuhl 2003
Cited by 1

Table 6: Characterization of goal-based evaluation of IT-systems in use Main

in Strategies for Information Systems Evaluation – Six Generic Types
by Stefan Cronholm, Göran Goldkuhl 2003
Cited by 1

Table 1: Main machine parameters during 1994 luminosity operation and design goals

in HERA Status and Plans
by Brinkmann For The
Next 10 →
Results 1 - 10 of 17,167
Powered by: Apache Solr
  • About CiteSeerX
  • Submit and Index Documents
  • Privacy Policy
  • Help
  • Data
  • Source
  • Contact Us

Developed at and hosted by The College of Information Sciences and Technology

© 2007-2019 The Pennsylvania State University