Results 1 - 10
of
17,167
Table 4.1: Measurement platforms, their coverage, and main science goals during the VOCALS RF field program. Measurement Platform Coverage/sampling Main science goals
2005
Table 1 Main ReSpecT predicates for reaction goals
"... In PAGE 8: ... In particular, R accomplishes the definition of the non-terminal symbol hReactioni in Table 3. The set O = fout; in; rd; inp; rdpg of the admissible communication op- erations, and the set Or = fout r; in r; rd r; no rg of the admissible reaction operations include all the operations for writing, accessing and consuming tu- ples according to both Table1 and Table 3. Altogether, the set O+ = O [ Or contains all the admissible tuple centre operations for a ReSpecT tuple centre.... ..."
Table 4: Local Oscillators { Main Speciflcations Item Speciflcation Goal (if difierent)
"... In PAGE 12: ... Thus the overall result is a compromise. Taking these considerations into account results in the power requirements given in Table4 A. For further discussion, see [21].... In PAGE 12: ... For further discussion, see [21]. Table4 A: First LO Power Band Freq Range Junctions Mixers Minimum Goal per mixer per pol. per pol.... In PAGE 12: ...3.4) at other telescopes allows more realistic requirements to be set, as shown in Table4 B. Here the requirements are expressed in time units, representing uctuations or uncertainty in signal delay; most efiects are nearly independent of observing frequency when expressed this way.... In PAGE 13: ...Table4 B: Phase Errors rms in fsec Basis Total Atmos Struct Elec Coherence Preliminary [21] 90% at 950 GHz 54.5 38.... In PAGE 13: ... The drift requirement applies to the phase change over a complete calibration cycle of at least 300 sec; it is desirable for it to be met for longer times, up to 1000 sec. We allocate the instrumental errors between the structure and the electronics somewhat arbitrarily, with 25% of the squared error allowed for the structure and 75% for the electronics; these are the values shown in Table4 B. The structural allowance is then somewhat smaller than the 50 fsec allowed in the speciflcation for the prototype antennas, but it is expected to be achievable.... ..."
Table 1. The main goal of the third step is to store the data base in an application friendly way. To this end, we provide two representations of the data base. An explicit version of the data base contains one point set for each planar order type, all in 16-bit integer representation.
in Abstract Order Type Extension and New Results on the Rectilinear Crossing Number (Extended Abstract)
"... In PAGE 2: ... Table1 : Number of order types of cardinality n = 11. Supporting the reliability in the construction of our data base, all algorithms to generate the complete data base of abstract order types are of purely com- binatorial nature.... ..."
Table 4: Experiment 2, main non terminal functions (kickTo TheirGoalPos)
1998
Cited by 1
Table 3: Characterization of goal-based evaluation of IT-systems as such Main
2003
Cited by 1
Table 5: Characterization of goal-free evaluation of IT-systems in use Main
2003
Cited by 1
Table 6: Characterization of goal-based evaluation of IT-systems in use Main
2003
Cited by 1
Table 1: Main machine parameters during 1994 luminosity operation and design goals
Results 1 - 10
of
17,167