A Branch-and-Bound Algorithm for the Resource-Constrained Project Scheduling Problem  (Make Corrections)  
U. Dorndorf, E. Pesch, T. Phan-Huy



  Home/Search   Context   Related

 
View or download:
winfo.unisiegen.de/pesch/do...rcpsp.ps
Cached:  PS.gz  PS  PDF   Image  Update  Help

From:  winfo.unisiegen.de/pes...publish (more)
(Enter author homepages)

Rate this article: (best)
  Comment on this article  
(Enter summary)

Abstract: We describe a time-oriented branch-and-bound algorithm for the resource-constrained project scheduling problem which explores the set of active schedules by enumerating possible activity start times. The algorithm uses constraint-propagation techniques that exploit the temporal and resource constraints of the problem in order to reduce the search space. Computational experiments with large, systematically generated benchmark test sets, ranging in size from thirty to one hundred and twenty... (Update)

Similar documents based on text:   More   All
0.2:   Constraint Propagation and Problem Decomposition: A.. - Dorndorf, Pesch.. (2002)   (Correct)
0.1:   Solving Project Scheduling Problems by Minimum Cut.. - Möhring, Schulz, Stork.. (2000)   (Correct)
0.1:   Information Visualization in Project Management And Scheduling - Zhang, Zhu (1998)   (Correct)

BibTeX entry:   (Update)

@misc{ dorndorf-branchbound,
  author = "U. Dorndorf and E. Pesch and T. Phan-Huy",
  title = "A Branch-and-Bound Algorithm for the Resource-Constrained Project Scheduling
    Problem",
  url = "citeseer.ist.psu.edu/725640.html" }
Citations (may not include all citations):
473   Foundations of Constraint Satisfaction (context) - Tsang - 1993
201   Understanding Line Drawings of Scenes with Shadows - Waltz - 1975
191   Algorithms for Constraint-Satisfaction Problems: A Survey - Kumar - 1992
83   An Algorithm for Solving the Job-Shop Problem (context) - Carlier, Pinson - 1989
54   A Generic ArcConsistency Algorithm and its Specializations - Van Hentenryck, Deville et al. - 1992
41   A New Approach to Computing Optimal Schedules for the Job-Sh.. - Martin, Shmoys - 1996
40   Time and Resource Constrained Scheduling: A Constraint Satis.. (context) - Nuijten - 1994
33   Resource-Constrained Project Scheduling: Notation (context) - Brucker, Drexl et al. - 1999
28   Cumulative Scheduling with Task Intervals - Caseau, Laburthe - 1996
28   Project Scheduling under Resource Constraints: Efficient Heu.. (context) - Kolisch - 1995
27   Activity Networks: Project Planning and Control by Network M.. (context) - Elmaghraby - 1977
26   New Benchmark Results for the Resource-Constrained Project S.. (context) - Demeulemeester, Herroelen - 1997
23   Scheduling Subject to Resource Constraints: Classification a.. (context) - la, Lenstra et al. - 1983
22   PSPLIB --- A Project Scheduling Problem Library - Kolisch, Sprecher - 1995
17   A Competitive Genetic Algorithm for ResourceConstrained Proj.. - Hartmann - 1998

[Article contains additional citations not shown here]

Documents on the same site (http://www-winfo.uni-siegen.de/pesch/publish.htm):   More
A Review of Exact Solution Methods for the Non-Preemptive.. - Kis, Pesch   (Correct)
Constraint Propagation and Problem Decomposition: A.. - Dorndorf, Pesch.. (2002)   (Correct)
An FPTAS for a single-item capacitated economic.. - Chubanov, Kovalyov.. (2005)   (Correct)

Online articles have much greater impact   More about CiteSeer.IST   Add search form to your site   Submit documents   Feedback  

CiteSeer.IST - Copyright Penn State and NEC