(Enter summary)
Abstract: . Progressive processing plans allow systems to tradeoff
computational resources against the quality of service by specifying
alternative ways in which to accomplish each step. When the structure
of a plan is known in advance, it can be optimally scheduled
by solving a corresponding Markov decision process. This paper extends
this approach to dynamic scheduling of plans that can be constantly
modified. We show how to construct an optimal meta-level
controller for a single task and how to extend ... (Update)
Similar documents based on text: More All
1.0: Handling Duration Uncertainty in Meta-Level Control of.. - Mouaddib, Shlomo (1997)
(Correct)
0.8: Reactive Control of Dynamic Progressive Processing - Zilberstein, Mouaddib (1999)
(Correct)
0.8: Optimal Scheduling of Dynamic Progressive Processing - Abdel-Illah Mouaddib And (1998)
(Correct)
BibTeX entry: (Update)
S. Zilberstein, A.I. Mouaddib, and A. Arnt. Dynamic scheduling of progressive processing plans. In Proceedings of the ECAI http://citeseer.ist.psu.edu/zilberstein00dynamic.html More
@misc{ zilberstein-dynamic,
author = "S. Zilberstein and A. Mouaddib and A. Arnt",
title = "Dynamic scheduling of progressive processing plans",
text = "S. Zilberstein, A.I. Mouaddib, and A. Arnt. Dynamic scheduling of progressive
processing plans. In Proceedings of the ECAI",
url = "citeseer.ist.psu.edu/zilberstein00dynamic.html" }
Citations (may not include all citations):
402
An analysis of time-dependent planning (context) - Dean, Boddy - 1988
180
Algorithms for scheduling imprecise computations (context) - Liu, Lin et al. - 1991
137
Do the Right Thing: Studies in Limited Rationality (context) - Russell, Wefald - 1991
85
Reasoning under varying and uncertain resource constraints
- Horvitz - 1988
83
Design-to-time real-time scheduling
- Garvey, Lesser - 1993
82
Optimal composition of real-time systems
- Zilberstein, Russell - 1996
30
Monitoring the progress of anytime problem-solving
- Hansen, Zilberstein - 1996
24
Models of continual computation
- Horvitz - 1997
21
Readings in Information Retrieval (context) - Jones, Willett - 1997
10
Contribution au raisonnement progressif et temps reel dans u.. (context) - Mouaddib - 1993
10
Optimal scheduling of dynamic progressive processing
- Mouaddib, Zilberstein - 1998
8
Handling duration uncertainty in metalevel control of progre..
- Mouaddib, Zilberstein - 1997
4
A conditional scheduling approach to designing real-time sys..
- Greenwald, Dean - 1998
Documents on the same site (http://www-is.informatik.uni-oldenburg.de/~sauer/puk2000/paper.html): More
OCLGraph: Exploiting Object Structure in a Plan Graph.. - Simpson, McCluskey, Liu (2000)
(Correct)
Considering the Dynamic in Knowledge Based Configuration - Kreuz (2000)
(Correct)
Heuristic Search Planning with BDDs - Edelkamp (2000)
(Correct)
Online articles have much greater impact More about CiteSeer.IST Add search form to your site Submit documents Feedback
CiteSeer.IST - Copyright Penn State and NEC