Yeong-Dae Kim, Hyeong-Gyu Lim, and Moon-Won Park, "Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process," European Journal of Operational Research, vol. 91, no. 1, pp. 124--143, 1996.

 Home/Search   Document Not in Database   Summary   Related Articles  

This paper is cited in the following contexts:
Optimization of High-Speed Multi-Station SMT Placement.. - Wang, Nelson, Tirpak (1999)   (3 citations)  (Correct)

....process planning systems [1] 2] for PWB assembly have been developed to help the industrial planner construct a process plan. Optimization of the job sequence on the PWB assembly line is required to operate the assembly line efficiently. This problem is usually solved as a flow shop problem [3] [4], 5] Analyses of the SMT assembly line [6] 7] 8] have shown that the automated placement machine is often the bottleneck, regardless of the arrangement of these machines (parallel or sequential) in the assembly line. Improving and automating the placement machine is the key issue for ....

Yeong-Dae Kim, Hyeong-Gyu Lim, and Moon-Won Park, "Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process," European Journal of Operational Research, vol. 91, no. 1, pp. 124--143, 1996.

Online articles have much greater impact   More about CiteSeer.IST   Add search form to your site   Submit documents   Feedback  

CiteSeer.IST - Copyright Penn State and NEC