| Wirag, S. "Adaptive Scheduling of Multimedia Documents". In Proceedings of Kommunikation in Verteilten Systemen (KiVS). 3/1999. |
....framework is extensible with media items, operators and managers that realize the semantics of the operators. 3 Scheduling of MAVA Documents The MAVA approach takes a graph as basis for the scheduling, which is similar to event nets [12] timed petri nets [1] and the scheduling graph of TIEMPO [5]. The MAVA Fig. 2. Communication between a manager and a media item. media item manager control events notification events framework supports the temporal synchronization by an API for the construction of the temporal scheduling graph. The scheduling graph is used by all managers that are ....
Wirag, S. "Adaptive Scheduling of Multimedia Documents". In Proceedings of Kommunikation in Verteilten Systemen (KiVS). 3/1999.
....between the nodes respectively events. A TS is also modeled by two nodes representing its start and end event. According to the specified projection, presentation interval nodes and TS nodes are related by appropriate edges. All our projections can be modeled by introducing appropriate edges [14]. Delays implied by interval operators are modeled as edges between presentation interval nodes, interaction interval nodes and TS nodes. Figure 4 shows on the left side a simple document specification and on the right side the corresponding eventgraph of the specification. The edges in an ....
Stefan Wirag. "Adaptive Scheduling of Multimedia Documents". Fakultätsbericht 1997/12, Universität Stuttgart, 7 1997.
Online articles have much greater impact More about CiteSeer.IST Add search form to your site Submit documents Feedback
CiteSeer.IST - Copyright Penn State and NEC