2 citations found. Retrieving documents...
Ho, J C and Chang, Y L (1991). A New Heuristic for the n-Job m-Machine Flowshop Problem, European Journal of Operational Research, Vol.52, 194-202.

 Home/Search   Document Not in Database   Summary   Related Articles   Check  

This paper is cited in the following contexts:
Multi-Level Hybrid Framework For The General Flow-Shop.. - Jain, Meeran   (Correct)

....a basis for comparisons among alternative approaches, old and new. Despite the large amount of research directed at flow shop instances most of the work has been applied to the permutation problem (Campbell et al. 1970, Dannenbring 1977, Nawaz et al. 1983, Widmer and Hertz 1989, Taillard 1990, Ho and Chang 1991, Reeves 1995, Carlier and Rebai 1996, Nowicki and Smutnicki 1996a, Yamada and Reeves 1997, Reeves and Yamada 1998) with as yet very little work on non permutation solutions (Nabeshima 1971, Krone and Steiglitz 1974, R ck and Schmidt 1983, Potts et al. 1991, Brucker 1998) The main contribution ....

Ho, J. C. and Chang, Y.- L. (1991) A New Heuristic for the n-Job M-Machine Flow-shop Problem, European Journal of Operational Research, vol 52, 194-202.


Hybridized Gas: Some New Results In Flowshop Scheduling - Jain, Bagchi (2000)   (Correct)

No context found.

Ho, J C and Chang, Y L (1991). A New Heuristic for the n-Job m-Machine Flowshop Problem, European Journal of Operational Research, Vol.52, 194-202.

Online articles have much greater impact   More about CiteSeer.IST   Add search form to your site   Submit documents   Feedback  

CiteSeer.IST - Copyright Penn State and NEC