2 citations found. Retrieving documents...
Jeremy Frank, Ari Jonsson, Robert Morris, and David Smith, "Planning and Scheduling for Fleets of Earth Observing Satellites," Proceedings of the 6th International Symposium on Artificial Intelligence, Robotics, Automation and Space 2002.

 Home/Search   Document Details and Download   Summary   Related Articles   Check  

This paper is cited in the following contexts:
Maximizing Flexibility: A Retraction Heuristic for.. - Kramer, Smith (2003)   (Correct)

....multiple resources, multi capacity resources, fixed time windows, and mission priority. Pemberton, 2000 ] proposes a solution to preserving priority in the face of over constrained resources by segmenting the problem into priority classes, solving them individually, and recombining them. [Frank et al. 2001 ] propose a contentionbased heuristic for use in solving a very similar problem within an iterative sampling framework. However, no experimental analysis is given. Finally, work in constraint satisfaction problem solving (CSP) has explored ideas similar to those introduced in this paper. V ....

J. Frank, A. Jonsson, R. Morris, and Smith D.E. Planning and scheduling for fleets of earth observing satellites. In Proc. 6th Int. Symposium on AI, Robotics and Automation for Space, 2001.


Scheduling Earth Observing Satellites with Evolutionary.. - Globus, Crawford, Lohn, ..   (Correct)

No context found.

Jeremy Frank, Ari Jonsson, Robert Morris, and David Smith, "Planning and Scheduling for Fleets of Earth Observing Satellites," Proceedings of the 6th International Symposium on Artificial Intelligence, Robotics, Automation and Space 2002.

Online articles have much greater impact   More about CiteSeer.IST   Add search form to your site   Submit documents   Feedback  

CiteSeer.IST - Copyright Penn State and NEC