| S. Srivastava, "Implementation of Global Scheduling," : Cydrome Internal Document, 1988. 34 |
....are merged with the schedule. There is no special treatment given to cycles in the flow graph. The main loop, i.e. pick a trace, schedule it, export constraints, handles cycles naturally inserting appropriate compensation blocks to reconcile constraints if necessary. In the Cydra 5 compiler [15, 16], acyclic scheduling is done at a basic block level after a global instruction motion phase. In a basic block, instructions are scheduled from bottom to top. An unscheduled basic block honors all resource usage and latency constraints coming from scheduled 30 predecessors and successors. ....
S. Srivastava, "Implementation of Global Scheduling," : Cydrome Internal Document, 1988. 34