| Basill V. R. and Zelkowitz M. V., Analyzing medium scale software development, In 3 rd International Conference on Software Engineering, pages 116-123, Atlanta, ACM and IEEE. |
....and drops to 0 when the system is completed. Using these assumptions, the solution becomes a Rayleigh curve giving the effort needed (unit cost) at time t: Unit cost = 2Kate a2 Developed initially by Putnam (Putnam, 1976) it has been shown to be an approximate measure on large systems (Basill, 1983). 5.2 Software Safety With the increasing usage of computers to control real time applications, the need to analyze risks in using these machine becomes vital. There is no such thing as absolute safety. Components break. And as much as we would not like to think about the dollar value of safety, ....
Basill V. R. and Zelkowitz M. V., Analyzing medium scale software development, In 3 rd International Conference on Software Engineering, pages 116-123, Atlanta, ACM and IEEE.
Online articles have much greater impact More about CiteSeer.IST Add search form to your site Submit documents Feedback
CiteSeer.IST - Copyright Penn State and NEC