| Teich J., "Digitale Hardware/Software-Systeme", Springer, 1997 4, 4.2 |
....the so called resource graph G R . We want to refer to it as the explicitly given resource constraints. The scheduling process has to find an appropriate binding with respect to the explicit given resource constraints. Therefore, we used a constraint driven list scheduling algorithm (Algorithm 1) [11]. The nominee set K t k of r k consists of those instructions whose predecessors are finished at the time t. The set G t k of r k consists of those instructions executed in t. Finally, through the function p a set S t of maximal priority can be chosen from K t k in order to get scheduled. ....
J. Teich. Digitale Hardware/Software-Systeme. SpringerVerlag, Berlin, Heidelberg, New York, 1997.
....target systems and the combined synthesis of hardware and software are presented. This overview is surely not complete and is only to compare categorise the approaches of this PhD thesis. 3.4. 1 Hardware Software Co design From the point of view of hardware software co design (compare for example [108]) a system consisting of hardware and software is generated from a complete specification. The majority of the co design tools focus on the partitioning between hardware and software, and are used in the field of embedded systems [18] The system specifications can be implemented in hardware as ....
J urgen Teich. Digitale Hardware/Software-Systeme. Springer, Heidelberg, 1997.
No context found.
Teich J., "Digitale Hardware/Software-Systeme", Springer, 1997 4, 4.2
Online articles have much greater impact More about CiteSeer.IST Add search form to your site Submit documents Feedback
CiteSeer.IST - Copyright Penn State and NEC