MetaCartSign in to MyCiteSeer

Include Citations | Advanced Search | Help

Include Citations | Advanced Search | Help

  Comparative Analysis on approximation algorithms for the Resource Constrained Project Scheduling Problem

Download:
Download as a PDF
by José Silva Coelho, Luis Valadares Tavares
http://www.adeit.uv.es/pms2002/papers/N103.pdf
Add To MetaCart

Abstract:

Citations

67 Resource-constrained project scheduling problem: Notation, classification, models and methods – Brucker, Drexl, et al. - 1999
62 Characterization and generation of a general class of resource-constrained project scheduling problems. Management Sci – Kolisch, Sprecher, et al. - 1995
49 Serial and parallel resource-constrained project scheduling methods revisited: theory and computation – Kolisch - 1996
26 Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem – Hartmann, Kolisch
16 Solving the RCPSP efficiently at modest memory requirements", Manuskripte aus den Instituten fr Betriebswirtschaftslehre der Universitt Kiel 425 – Sprecher - 1996
15 Tabu search algorithms and lower bounds for the resource-constrained project scheduling problem – Baar, Brucker, et al. - 1998
10 Class-based control schemes for parameterized project scheduling heuristics", Manuskripte aus den Instituten fr Betriebswirtschaftslehre der Universitt Kiel 471 – Schirmer, Riesenberg - 1998
5 Generalized pairwise interchanges and machine scheduling – Croce - 1995
2 Heuristic Algorithms for Solving the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis – Kolish, Hartman - 1998
1 The risk of delay of a project in terms of the morfology of its network – Tavares, Ferreira, et al. - 1999
1 A Competitive Genetic Algorithm for Resource-Constrained – Hartman - 1998