See this document in CiteSeerX!

Estimating, Planning and Controlling Labor in the Industrialized Housing Factory  (Make Corrections)  
Mohammed Arif, Michael A. Mullens, Ph.D., PE, Dayana Espinal and R. Scott...



  Home/Search   Context   Related

 
View or download:
pitt.edu/iie2002/proceedings...2246.pdf
Cached:  PS.gz  PS  PDF   Image  Update  Help

From:  pitt.edu/iie2002/proceedings/i... (more)
(Enter author homepages)

Rate this article: (best)
  Comment on this article  
(Enter summary)

Abstract: Industrialized housing manufacturers build large-scale, custom housing components on near synchronous production lines with negligible automation. While labor represents a relatively small fraction of production cost, it has a substantial impact on operations. If the labor provided does not match production needs, bottlenecks form and quality suffers. The numerous production operations, lengthy cycle times and extensive product customization have discouraged manufacturers from accurately... (Update)

Active bibliography (related documents):   More   All
0.5:   Structural Estimation of First-Price Auction Models: Measuring.. - Hong, Shum (1999)   (Correct)
0.0:   Problem Difficulty for Tabu Search in Job-Shop Scheduling - Watson, Beck, Howe, Whitley (2002)   (Correct)
0.0:   On Solving the Classic Job Shop Makespan Problem by.. - Schultz, Hodgson, King (2004)   (Correct)

Similar documents based on text:   More   All
0.2:   Logic Programming in the LF Logical Framework - Pfenning (1991)   (Correct)
0.2:   Mechanically Verifying the Correctness of an Offline Partial.. - Hatcliff (1995)   (Correct)
0.2:   Elf: A Language for Logic Definition and Verified Metaprogramming - Pfenning (1989)   (Correct)

BibTeX entry:   (Update)

@misc{ michael-estimating,
  author = "Mohammed Arif Michael",
  title = "Estimating, Planning and Controlling Labor in the Industrialized Housing
    Factory",
  url = "citeseer.ist.psu.edu/535704.html" }
Citations (may not include all citations):
23   Guided Local Search with Shifting Bottleneck for Job Shop Sc.. (context) - Balas, Vazacopoulos - 1998  ACM
2   Construction management (context) - Halpin, Woodhead - 1998
1   Design for a Manufacturing Data Base for Management Use (context) - Vicker - 1983
1   and Work Design (context) - Niebel, Freivalds - 1999
1   Estimating Labor Production Rates for Industrial Constructio.. (context) - AbouRizk, Knowles et al. - 2001
1   Automated Builder: Dictionary/Encyclopedia of Industrialized.. (context) - Carlson - 1991

Documents on the same site (http://fie.engrng.pitt.edu/iie2002/proceedings/ierc/papers/):   More
Visual Attention Loss Function During Automation Monitoring.. - Byrd, Adams, Ntuen   (Correct)
Risk Assessment of Industrial Capitalization Projects - Yuhasz, Davis   (Correct)
Development of a Lean Activity-Based Scorecard for Process.. - Ariyawongrat, Needy   (Correct)

Online articles have much greater impact   More about CiteSeer.IST   Add search form to your site   Submit documents   Feedback  

CiteSeer.IST - Copyright Penn State and NEC